Tanks Construction Planner

Requisition ID: 282739 

  • Relocation Authorized: National - Family 
  • Telework Type: Full-Time Office/Project 
  • Work Location: Port Arthur, TX 

 

Extraordinary teams building inspiring projects:

Since 1898, we have helped customers complete more than 25,000 projects in 160 countries on all seven continents that have created jobs, grown economies, improved the resiliency of the world's infrastructure, increased access to energy, resources, and vital services, and made the world a safer, cleaner place. 

Differentiated by the quality of our people and our relentless drive to deliver the most successful outcomes, we align our capabilities to our customers' objectives to create a lasting positive impact. We serve the Infrastructure; Nuclear, Security & Environmental; Energy; Mining & Metals, and the Manufacturing and Technology markets. Our services span from initial planning and investment, through start-up and operations. 

Core to Bechtel is our Vision, Values and Commitments. They are what we believe, what customers can expect, and how we deliver. Learn more about our extraordinary teams building inspiring projects in our Impact Report

Project Overview:

The PALNG Project involves construction of a grassroots liquefaction and export facility along the Sabine-Neches waterway in Port Arthur, Texas. The Project is located in Southeast Texas on a region of land off the Sabine-Neches Waterway, which is connected to the Gulf of Mexico and the Intracoastal Waterway. Bechtel’s scope includes:  Two liquefaction trains, with capacity of producing 6.73 million tons per annum, Two 160,000 m³. LNG tanks, A marine facility with up to two LNG berths, A Material Offloading Facility (MOF) and two Pioneer construction docks, Condensate loading and refrigerant unloading truck facilities and all other associated facilities and utilities, including electrical power, condensate and refrigerate storage, and flares. Feed gas for liquefaction will be supplied though a high pressure 42”-diameter, underground pipeline transporting interstate quality natural gas from multiple supply regions and reservoirs. Construction of the project will utilize approximately 937 acres of undeveloped land, wetlands, and open water; of which approximately 900 acres will be altered and repurposed for construction of the PALNG liquefaction facility. All vessel traffic will access the Project via the Port Arthur Canal. Additionally, all construction equipment, vehicles and personnel will access the site from State Highway (SH) 87.

Job Summary:

Performs schedule development, maintenance, and monitoring activities. Supports project organizational and administrative activities when delegated. Supervises planning/scheduling activities when delegated. Ensures work is completed as scheduled. Identifies schedule-associated cost trends for management attention for tanks scope of entire facility. #LI-CS1

Major Responsibilities:

  • Prepares project control plans and detailed staffing utilization plans for discipline or specialty activities for tanks on entire facility.
  • Assists in preparing schedule data for proposals or contract negotiations.
  • Participates in developing and presenting training classes on designated subjects and on-the-job training for specific processes and practices.
  • Ascertains that the correct scope of work is reflected on all schedules.
  • Integrates interdiscipline schedule requirements and constraints to establish logical work sequences for assigned disciplines or specialties. Works with the performing organizations and units to coordinate work sequences with the total project plan.
  • Establishes and implements methods for determining activity durations within assigned disciplines or specialties. 
  • Develops quantity release or installation curves for assigned disciplines or specialties. Reviews and evaluates quantity records to ensure total quantities are represented for a particular discipline or specialty. Develops required jobhour expenditure for assigned disciplines or specialties. Assists in determining leveling decisions. Performs quantity, manpower, and cost resource loading for assigned schedules. Performs invoice preparation for payments based on cost loaded schedules as required. Performs performance monitoring and control functions.
  • Reviews schedule data, and identifies and acquires the information needed to complete work logics to interface between assigned disciplines or specialties. Assists in developing specific project codes of accounts and work breakdown structures, and recommends appropriate modifications and revisions.
  • Determines critical-path activities for assigned discipline or specialties, and identifies significant activities supporting interdiscipline requirements. Identifies critical path for discipline or specialty work activities.
  • Develops and monitors short term (2-4 week) engineering and/or construction schedules.
  • Monitors schedule deviation for assigned disciplines or specialties including subcontractor submittals, and recommends corrective action/workaround solutions for project considerations.
  • Develops and writes the schedule commentary that appears in the monthly progress and similar reports.
  • Identifies and reports activities that have a critical or potential impact on the schedule, and prepares and presents the Schedule Impact Report (CIAR).

Education and Experience Requirements:

  • 8+ Years of planning experience with some tank related planning experience preferred.

Required Knowledge and Skills:

  • Knowledge of construction planning and execution
  • Primavera 
  • Strong ability to convey visual data sets
  • Strong Microsoft Excel Skills
  • Strong communication skills and ability to multi-task

Total Rewards/Benefits:

For decades, Bechtel has worked to inspire the next generation of employees and beyond! Because our teams face some of the world's toughest challenges, we offer robust benefits to ensure our people thrive.  Whether it is advancing careers, delivering programs to enhance our culture, or providing time to recharge, Bechtel has the benefits to build a legacy of sustainable growth. Learn more at Bechtel Total Rewards

Diverse teams build the extraordinary:

As a global company, Bechtel has long been home to a vibrant multitude of nationalities, cultures, ethnicities, and life experiences. This diversity has made us a more trusted partner, more effective problem solvers and innovators, and a more attractive destination for leading talent.

We are committed to being a company where every colleague feels that they belong-where colleagues feel part of "One Team," respected and rewarded for what they bring, supported in pursuing their goals, invested in our values and purpose, and treated equitably. Click here to learn more about the people who power our legacy.

 

Bechtel is an Equal Opportunity Employer. All qualified applicants will receive consideration for employment without regard to race, color, religion, sex, sexual orientation, gender identity and expression, age, national origin, disability, citizenship status (except as authorized by law), protected veteran status, genetic information, and any other characteristic protected by federal, state or local law. Applicants with a disability, who require a reasonable accommodation for any part of the application or hiring process, may e-mail their request to acesstmt@bechtel.com